You opened a letter from your homeowners insurance company. It says replace your roof, or your policy will not be renewed. There is a deadline in it.

Here is what to do in the first seven days. Not someday — this week, in this order.

For the full picture on why these letters go out and what your options are, read our main page first: Insurance Company Says Replace Your Roof or Lose Coverage?

Day 1: Read the letter twice, and write down the deadline

Do not skim it. Read the whole thing, then read it again.

Write down three things:

  1. The deadline. The exact date the carrier wants the work done or the documentation submitted. This is the date everything else works backward from.
  2. What the carrier is actually asking for. A full replacement? Proof of the roof’s condition? A specific form? The letter does not always say “replace the roof” in those words — read what it requires, not what you fear it requires.
  3. What the carrier based its decision on. The letter sometimes says: the roof’s age on file, an inspection, aerial imagery. That basis matters, because it tells you what kind of answer will move the file.

Put the letter somewhere safe. Do not throw it away, and do not let it sit in a pile. You will need the original.

What not to do on Day 1: do not call a roofing company and agree to a replacement on the spot, and do not call the carrier and argue. You do not yet have the facts on your side. You will get them this week.

Day 2: Make two calls

Call 1: Your insurance agent. Not the carrier’s claims line — your agent, the person who sold you the policy. Tell them you received the letter and ask two questions: what exactly is required, and what happens if you submit documentation showing the roof still has life left? Agents are often your best ally here, because they want to keep your business and they know how to get a file reviewed.

Call 2: Clearview Roofing & Construction at 631-262-7663. Tell us you received an insurance roof replacement demand or non-renewal notice, and share the deadline. We will schedule an in-person roof inspection — fast, because the deadline is real and both paths (challenging the demand or replacing the roof) take time to do properly.

Day 3: Get the inspection

A qualified roofer gets on your roof. Not a drive-by, not a drone photo — a person walking the roof, looking at the shingles, flashing, valleys, penetrations, and ventilation, and photographing what they find.

This is the day you get the straight answer:

Either way, you leave Day 3 knowing which path you are on. That is the whole point of this week.

Day 4: Review the findings, no pressure

Take a day to sit with the inspection results. If the roof has life left, review the draft report and make sure you understand what it says. If the roof needs replacement, get the estimate in writing and look at the scope, the materials, and the schedule — and whether it can be completed before the deadline.

Do not let anyone rush you into signing on Day 4. A legitimate roofer will not pressure you. A deadline is a reason to move quickly, not a reason to sign blind.

Day 5: Get the documentation in final form

If you are challenging the demand: the conflicting roof report is finalized, with photos, condition assessment, remaining life estimate, and our company identification.

If you are replacing: the contract and scope are finalized, the job is scheduled, and you have written confirmation of the completion date relative to the carrier’s deadline.

Either way, Day 5 ends with paperwork you can hand to someone — not a conversation, a document.

Day 6: Submit it to your carrier or agent

Send the documentation — the conflicting roof report, or the replacement contract and schedule — to your carrier or agent, and ask in writing for your file to be reviewed in light of it.

Send it in a way you can prove: email with a read receipt, or a portal upload with a confirmation. If you mail it, send it certified. This is a paper trail, and paper trails protect you.

Then call your agent and confirm they received it.

Day 7: Confirm receipt, and calendar the deadline

By the end of Day 7, you should have:

That is a strong position. You are no longer a homeowner hoping a letter goes away. You have documentation on file, a confirmed submission, and a deadline you are managing instead of fearing.

What not to do, all week

If you are holding a letter right now

Day 1 starts today. The deadline in your letter is not going to move on its own.

Call Clearview Roofing & Construction at 631-262-7663. Tell us about the letter and the deadline. We will inspect your roof in person and give you a straight answer about which path you are on — while there is still time to act on it.

Related reading:

About the Author

Chris Feniello is the Managing Partner of Clearview Roofing & Construction, a Long Island roofing company serving Suffolk and Nassau counties since 1961. He leads the company’s roofing, insurance-claims, and construction work across its five Long Island offices.

Clearview Roofing & Construction serves Suffolk and Nassau counties, with offices in Northport, Babylon, and Huntington, and Port Washington and Rockville Centre. Headquarters: 171 Main Street, Port Washington, NY 11050.

Get Started Today

Get a quote for your new roof by filling out the form below. A technician will follow up with you in 1-2 business days.